The Mosque capacity was found inadequate during Juma prayer and in order to use the available space around the facility, this expansion has been recommended. As per SABIC Engineering Standard SES-B01-E03 Design of Buildings for Petrochemicals Plants the existing Maintenance Mosque is classified as Group A general buildings.
GCC develop the design drawings base on Albayroni requirements and data gathered along with the scope of work as mentioned in contract document. The scope of construction and supply shall be based on Albayroni approved design drawings and requirements as mentioned in scope of work.