GCE was awarded the construction of the following new facilities:
GCE carry out initial site survey to confirm the location with Albayroni, establish the underground utilities interference and relocation if necessary. GCE develop the design drawings based on Albayroni requirements and initial data gathered along with scope of work as mentioned in contract document. The scope of construction and supply was based on Albayroni approved design drawings and requirements.