The project consist of replacing the roof cladding sheets for central warehouse, AC storage building, capital storage building, ceremony hall and bonded storage house and cable storage buildings, the scope also includes the replacement of roof gutter, down spouts, and damaged wall cladding sheets as per HADEED requirement.
GCE construct all civil and structural components taking into considerations the existing area condition in accordance with SABIC Engineering Standards and Royal Commission Environmental Regulations including the complete survey and study of the site.